MkII Soldiers
Standard MkII soldiers and ancillaries can be used for the construction of concrete parapets and bridge decks in a variety of applications - underslung suspended formwork, steel composite bridges, pre-cast concrete bridges, overslung static or travelling frames.

The soldiers can be under-slung beneath the bridge to enable the concreting of bridge decks and parapets to both steel composite and pre-cast concrete bridge construction. This solution can be used for the construction of the full width of a bridge deck in a single pour.
The MKII Soldier can be used for suspending bridge falsework over roads, railway lines and waterways.
The MkII Soldier has also been used on numerous projects as an overslung frame. This solution gives an economical frame for repairing bridge parapets or casting newly formed parapets after the central deck section has been poured.
The MkII Soldier overslung frame can be a project-specific design, using standard soldier components, to make a strong, stable frame for the construction of any size of parapet.
Associated Products
| Search Technical Library | |
|---|---|
|
|
|

